Well day one went well…
Thursday, November 22nd, 2007In summary:
* Gas boiler in the kitchen - disconnected
* Airing cupboard upstairs - water tank emptied and ripped out
* Loft - water tank emptied and ripped out
* Both above - water pipes ripped out
* Upstairs carpet removed and floorboards removed to install new pipes (not done). This included moving or stuff out of one room to another room.
* New radiator installed in my study room and our bedroom.
That was for day one. Tomorrow, they will fit the radiators in the 3rd bedroom, 2 x in the living rooms and also the porch before making a start with other jobs.
Then the weekend of no jobs as they don’t work over weekend. They start on Monday with a possible of extending it into Tuesday as they said there are a lot of work to do. But with the amount of work they did today, I think they still can finish on Monday…otherwise I’ll have to ask my boss for another day off from work.
Things left to do:
* New piping around the house including under the floorboard
* New 22mm Gas pipe to be fitted from the gas mains to the new gas boiler
* Removal of the old gas boiler
* Other bits that I don’t know. Hopefully will find out tomorrow…
And we were freezing our arses off all day today with the door open as they had to route a water hose pipe to the front door get the water off. So the cold wind got into the house - BRRRRR. They also said there will be no hot water until Monday. Good thing we have electricity shower with its own heater.
They are going to turn up one hour earlier tomorrow, so we need to wake up a bit early. Ughhhhh.